ISSN 1000-3665 CN 11-2202/P

    基于流固耦合作用的富水断层区隧道初期支护优化分析

    Optimization analysis of initial support of water-rich fault zone tunnel based on fluid-solid interaction

    • 摘要: 隧道支护结构设计往往都是依靠工程类比法和经验法,没有较为合理的设计方法,而且设计人员为了保证富水断层区隧道稳定性,常常会增加支护参数,使得隧道的安全系数偏大,造成施工困难和不必要的经济浪费。以赣州—深圳(赣深)铁路客运专线的龙南隧道为工程背景,基于流固耦合理论,采用FLAC3D对穿越F8富水断层区隧道开挖和支护全过程进行数值模拟;结合断层区的工程与水文地质条件以及六部CD法的施工特点,选取断层区中间部位的中轴线、左拱顶区、右拱顶区3个监测点的沉降值建立偏差平方和函数DEVSQ,分析拱顶变形、塑性区体积及渗流场变化特征。模拟结果表明:(1)钢拱架的合理间距为1.0 m,喷射混凝土的合理厚度为26~30 cm,并通过三次曲线拟合得出该典型断面喷射混凝土的最优厚度为28 cm;(2)钢拱架间距为1.0m时,塑性区体积随初支混凝土厚度增大而减小,当初支喷射混凝土厚度大于28 cm时,塑性区体积减小幅度很小,通过增加喷射混凝土厚度来提高初支结构的安全性是不经济的,验证了初支钢拱架间距和喷射混凝土厚度优化的合理性;(3)在最优初支条件下,隧道渗流量较为明显部位是拱脚>边墙>拱底>拱顶;(4)将模拟结果与监测结果对比,两者虽然有所差异,但变化规律相近,量级一致,模拟结果能够反映实际情况。研究结果可为类似地层条件下其他隧道施工与支护提供重要的参考价值和理论依据。

       

      Abstract: The design of tunnel supporting structure often relies on engineering analogy method and experience method, and there is no reasonable design method. Moreover, in order to ensure the stability of tunnel in water-rich fault zone, the designers often increase the supporting parameters, this makes the tunnel factor of safety too large, resulting in construction difficulties and unnecessary economic waste. Based on the fluid-structure coupling theory, the whole process of tunnel excavation and support across F8 water-rich fault zone is simulated by FLAC3D in the background of longnan tunnel of Ganzhou-Shenzhen railway passenger dedicated line combined with the engineering and hydrogeological conditions of the fault zone and the construction characteristics of the six CD methods, the center axis, left vault area and right vault area of the middle part of the fault zone are selected to establish the deviation square sum function (DEVSQ) . The simulation results show that: (1) The reasonable space of steel arch frame is 1.0 m, the reasonable thickness of shotcrete is 26−30 cm, and the optimal thickness of shotcrete is 28 cm by cubic curve fitting. (2) When the space between steel arch frames is 1.0 m, the volume of the plastic zone decreases with the increase of the thickness of the initial branch of shotcrete. When the thickness of the initial branch of shotcrete is greater than 28 cm, the volume of the plastic zone decreases very little, it is not economical to increase the thickness of shotcrete in order to improve the safety of the initial-support structure, and the rationality of the optimization of the spacing of the initial-support steel arch frame and the thickness of shotcrete is verified. (3) Under the optimal initial support condition, the obvious location of seepage is arch foot > side wall > arch bottom > Arch crown. (4) Comparing the simulation results with the monitoring results, although there are some differences between the two results, the variation regularity is similar and the order of magnitude is the same, the simulation results can reflect the actual situation. The research results can provide important reference value and theoretical basis for other tunnel construction and support under similar stratum conditions.

       

    /

    返回文章
    返回