    斜井二次涌水原因分析及注浆治理措施

    Hydrogeological Analysis and Control of Groundwater Inrush for the Second Time in an Inclined Shaft

    • 摘要: 山西潞安集团黑龙煤矿副斜井在经过迎头预注浆后,在预注浆段内掘进时再次发生涌水现象,导致井筒被淹。分析其主要原因为初次注浆形成的软粘土与浆液共同的裂隙充填体稳定性差。对于涌水裂隙采取分流泄压再堵水的总体治理方案,即变不可控涌水为可控水后再注浆处理。涌水点注浆堵水严格控制注浆压力,采用水泥-水玻璃双液浆。通过布设检查孔对注浆效果进行检查分析注浆质量较好,为类似有软粘土充填裂隙岩体的注浆治理提供借鉴。

       

      Abstract: A groundwater inrush occurred again when the auxiliary inclined shaft which excavation came to the pregrouting interval, which submersed the shaft of the Heilong Coalmine, Shanxi Province. The main cause was the poorness of the fracture stability, which formed during the interaction of soft clay and grout in the first grouting process. The method “distributary to relieve pressure then prevent water inflow” was taken, that was to change the uncontrollable gushing to controllable gushing then grouting. Last, borehole was used to examine the effect of the grouting, the results showed that the effect was good. The paper provides reference for similar grouting in rock mass which filled with soft clay.

       

    /

    返回文章
    返回