ISSN 1000-3665 CN 11-2202/P
    LIUGuo-hua~, . Application of shallow three-component seismic prospecting technique to the investigation of subsurface fractures and hidden holes under highways in western China[J]. Hydrogeology & Engineering Geology, 2008, 35(5): 101-105.
    Citation: LIUGuo-hua~, . Application of shallow three-component seismic prospecting technique to the investigation of subsurface fractures and hidden holes under highways in western China[J]. Hydrogeology & Engineering Geology, 2008, 35(5): 101-105.

    Application of shallow three-component seismic prospecting technique to the investigation of subsurface fractures and hidden holes under highways in western China

    • This paper involves the hazard of geological defects,addresses the progress of shallow three-component seismic prospecting and its application in geological hazard investigation of highways.Through practical examples and the effect of application in highway geological hazard investigation,the three-component seismic prospecting technique is proved a modernized prospecting technique and becomes a part of systemic project of geological hazard control.It will play a very important role in geological hazard investigation.With its prominent characteristics such as fast,comprehensive,accurate and economical,the shallow three-component seismic prospecting in many areas especially in sensitive areas can reach non-destructive exploration and supply scientific proof for construction project of geological hazard control.
    • loading

    Catalog

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return