An analysis of construction conditions of Hutuo river groundwater reservoir
-
-
Abstract
In this paper,the construction conditions of the Hutuo river groundwater reservoir are analyzed.The following conclusions can be drawn.The boundaries of Hutuo river groundwater reservoir are nearly closed,and the storage capacity is as high as 10.04×108m3.The Hutuo river bed can be used as natural groundwater reservoir leakage field.The infiltration test show that on the dynamic water conditions,stable infiltration amount per unit length of river is 29.18×104m3/km.d(average channel width is 222m...
-
-